D-40

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1992-06-23
Personnel B.L., R.H & J.B.
Temperature (°F) 72
Humidity (%) 48
Wind Direction NW
Wind Speed (MPH) 6
Barometer (in.Hg) 28.65

Test Results

Inspect tow equipment-bus interface No problems noted.
Inspect tow equipment-wrecker interface No problems noted.
Towing Comments A 4" x 4" beam and a 6" x 6" beam were used to allow the chains attached to the axle enough space to clear the wheelchair lift cover.
Description and location of any structural damage
General Comments