CNG TROLLEY TR35-84

SUPREME CORPORATION Pdf Download PDF Report

Economy Pre-Test Inspection

Date
2001-11-29

Personnel
S.C.9

Pre Warm-Up

If OK, Initial
Fuel Economy Pre-Test Maintenance Form is complete t
Cold tire pressure (psi): Front 95.0 Rear 95.0 t
Tire Wear t
Engine oil level t
Engine coolant level t
Interior and exterior lights on, evaporator fan on t
Fuel economy instrumentation installed and working properly t
Fuel line -- no leaks or kinks t
Speed measuring system installed on bus. Speed indicator installed in front of bus and accessible to TECH and Driver t
Bus is loaded to SLW t

Warm-Up

Bus driven for at least one hour warm-up t
No extensive or black smoke from exhaust t

Post Warm-Up

Warm tire pressure (psi): Front 95.0 Rear 97.0 t
Environmental conditions
  • Average wind speed <12 mph and maximum gusts <15 mph
  • Ambient temperature between 30° (-1°) and 90°F (32°C)
  • Track surface is dry
  • Track is free of extraneous material and clear of interfering traffic
t