D-40

NEW FLYER Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1994-05-26 Temperature: 75
Personnel: B.L., B.R., D.O., & S.C. Test Load (lbs): 25875
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.026 0.026 0.007 0.007
2 0.000 0.830 0.830 0.005 0.005
3 0.000 0.118 0.118 0.006 0.006
4 0.000 0.119 0.119 0.004 0.004
5 0.000 0.079 0.079 0.002 0.002
6 0.000 0.079 0.079 0.002 0.002
7 0.000 0.108 0.108 0.024 0.024
8 0.000 0.168 0.168 0.030 0.030
9 0.000 0.221 0.221 0.031 0.031
10 0.000 0.199 0.199 0.029 0.029
11 0.000 0.142 0.142 0.028 0.028
12 0.000 0.061 0.061 0.024 0.024

Loading Sequence: 1

Date: 1994-05-26 Temperature: 75
Personnel: B.L., B.R., D.O., & S.C. Test Load (lbs): 25875
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.007 0.029 0.022 0.009 0.002
2 0.055 0.080 0.025 0.004 -0.051
3 0.006 0.112 0.106 0.003 -0.003
4 0.004 0.113 0.109 0.002 -0.002
5 0.002 0.075 0.073 0.001 -0.001
6 0.018 0.081 0.063 0.021 0.003
7 0.024 0.110 0.086 0.028 0.004
8 0.030 0.170 0.140 0.032 0.002
9 0.031 0.224 0.193 0.034 0.003
10 0.029 0.200 0.171 0.031 0.002
11 0.028 0.145 0.117 0.031 0.003
12 0.024 0.068 0.044 0.028 0.004