D-40

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1995-02-03
Personnel B.L., B.R. & R.H.
Temperature (°F) 21
Humidity (%) 65
Wind Direction SW
Wind Speed (MPH) 2
Barometer (in.Hg) 30.07

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed by attaching choins to the front axle.
Description and location of any structural damage
General Comments No damage or deformation was observed, and no problems encountered with the towing interface.