AN 440L

NEOPLAN USA CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1994-06-01
Personnel B.L., & D.F.
Temperature (°F) 74
Humidity (%) 45
Wind Direction NNW
Wind Speed (MPH) 9
Barometer (in.Hg) 29.82

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made..
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments The interface was accomplished at the front axle by means of a hydraulic boom type towing apparatus with safety chains attached. The rear axle shaft was removed.
Description and location of any structural damage
General Comments The manufacturer does not recommend towing from the rear.