XB20RD

DOUBLE K INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1996-06-20
Personnel B.L., S.C., & R.H.
Temperature (°F) 84
Humidity (%) 89
Wind Direction N
Wind Speed (MPH) 5
Barometer (in.Hg) 30.03

Test Results

Inspect tow equipment-bus interface A safe and adequate connection wa made using chains from the axle to the tow equipment.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments Safety chains were also attached to the front axle, then to the tow equipment. A rubber pad was used between the bumper and tow equipment to prevent damage.
Description and location of any structural damage
General Comments A front lift tow was performed without incident.