Dynamic Towing Test Data Form

Date 1997-07-15
Personnel B.L., S.C., and R.H.
Temperature (°F) 88
Humidity (%) 55
Wind Direction sw
Wind Speed (MPH) 6
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment (chains) and the wrecker.
Towing Comments A front lift tow was performed by chaining to the axle.
Description and location of any structural damage
General Comments None