RTS T-DRIVE

NOVA BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-04-10
Personnel S.C., K.D., E.D., & E.L.
Temperature (°F) 65
Humidity (%) 40
Wind Direction WSW
Wind Speed (MPH) 3
Barometer (in.Hg) 30.01

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A hydraulic under lift was incoporated as the towing interface.
Description and location of any structural damage None noted
General Comments No problems were noted.