GC II 8551

GOSHEN COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-05-01
Personnel S.C. & E.D.
Temperature (°F) 71
Humidity (%) 65
Wind Direction SW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.09

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed with no damage, deformation or problems observed.
Description and location of any structural damage
General Comments Rear towing is not recommended; therefore a rear tow was not performed.