CTS

CHAMPION BUS INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2003-01-10 Temperature: 65
Personnel: E.D., E.L., T.S., & M.H. Test Load (lbs): 19
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.021 0.021 0.011 0.011
2 0.000 0.148 0.148 0.007 0.007
3 0.000 0.109 0.109 0.008 0.008
4 0.000 0.125 0.125 0.011 0.011
5 0.000 0.096 0.096 0.005 0.005
6 0.000 0.238 0.238 0.026 0.026
7 0.000 0.227 0.227 0.011 0.011
8 0.000 0.058 0.058 0.025 0.025
9 0.000 0.082 0.082 0.007 0.007
10 0.000 0.074 0.074 0.003 0.003
11 0.000 0.037 0.037 0.005 0.005
12 0.000 0.072 0.072 0.000 0.000

Loading Sequence: 1

Date: 2003-01-10 Temperature: 65
Personnel: E.D., E.L., T.S., & M.H. Test Load (lbs): 19
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.011 0.017 0.006 0.009 -0.002
2 0.001 0.049 0.048 0.008 0.007
3 0.008 0.110 0.102 0.010 0.002
4 0.011 0.125 0.114 0.013 0.002
5 0.005 0.097 0.092 0.007 0.002
6 0.026 0.247 0.221 0.009 -0.017
7 0.011 0.232 0.221 0.009 -0.002
8 0.025 0.079 0.054 0.027 0.002
9 0.007 0.083 0.076 0.009 0.002
10 0.003 0.077 0.074 0.005 0.002
11 0.005 0.037 0.032 0.006 0.001
12 0.000 66.000 66.000 -0.003 -0.003