CTS

CHAMPION BUS INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-04-29
Personnel K.D., E.L. & D.L.
Temperature (°F) 70
Humidity (%) 30
Wind Direction WSW
Wind Speed (MPH) 13
Barometer (in.Hg) 29.82

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage None noted
General Comments None noted