GCII 6552

GOSHEN COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-02-04
Personnel S.C. and T.S.
Temperature (°F) 40
Humidity (%) 66
Wind Direction calm
Wind Speed (MPH) calm
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed.
Description and location of any structural damage
General Comments Manufacturer does not recommend towing from the rear.