ENVIRO 500

ALEXANDER DENNIS INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-08-18
Personnel T.S., R.C. and C.S.
Temperature (°F) 68
Humidity (%) 61
Wind Direction sw
Wind Speed (MPH) 3
Barometer (in.Hg) 30.29

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front flat tow was performed incorporating the manufacturer-supplied towing apparatus.
Description and location of any structural damage
General Comments No problems were encountered with the tow or towing interface.