ULTRA LF

BLUE BIRD CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2006-04-14
Personnel T.S. & S. C.
Temperature (°F) 62
Humidity (%) 85
Wind Direction SE
Wind Speed (MPH) 7
Barometer (in.Hg) 29.95

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the towing interface or tow were encountered.